Stephen Wang, VP Spring Airlines, has told Airbus that it isn’t producing aircraft fast enough. The airline has asked the aircraft manufacturer to ramp up production of the A320neo aircraft, of which it has 60 on order and is looking to order more.
Related posts
AIPA seeks to appeal shut down of industrial action
11th November 2011