Boeing is to increase production from two to 2.5 aircraft per month on its Everett, Washington final assembly line this summer, as it seeks to bring its second Charleston, South Carolina factory online. By 2013 Boeing hopes to produce 10 787s per month.
Related posts
SilkAir finalises 737 order
15th November 2012